Sign In | Join Free | My xxjcy.com
China Shanghai Yekun Construction Machinery Co., Ltd. logo
Shanghai Yekun Construction Machinery Co., Ltd.
Shanghai Yekun Construction Machinery Co., Ltd.
Verified Supplier

6 Years

Home > Pile Driver Long Boom >

Side Grip Hydraulic Vibratory Hammer Pile Driver For 20T Excavator

Shanghai Yekun Construction Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Side Grip Hydraulic Vibratory Hammer Pile Driver For 20T Excavator

Brand Name : VIBRA

Model Number : SV-200

Certification : ISO 9001:2015

Place of Origin : Shanghai, China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, D/P, Western Union, MoneyGram, L/C

Supply Ability : 10 set/month

Delivery Time : 15-35 days

Packaging Details : 4 CBM

Name : Side Grip Pile Driver

Feature : Pile Driving in small working areas

Vibration : 3000 rpm

Centrifugal Force : 332-384 KN

Hammer : 1400-1700 kg

Excavator : 20T

Material : Steel, Core materials are all imported

Color : Blue, customized color available

HS Code : 84301000

Size (LxWxH) : 1320X1160X1820

Rotation/tilt Angle : 360/+-30 degree

Eccentric Torque : 3.07kgm

Condition : New

Type : Hydraulic Vibrating Hammer

Contact Now

Side Grip Pile Driver

More secure and quicker than conventional Pile Drivers available, this model highlights a side and base clip to effectively pick up, tilt and turn piles for more precise outcomes.

 

VIBRA Side Grip Pile Driver is extraordinarily designed as excavator mounted vibro hammers. Side grip is handily adjusted to the excavator by association section created by VIBRA. They are hydraulically determined by the excavator and effortlessly worked by the excavator operator. With an ergonomic design and superior execution, different capacities excavator mounted VIBRA side grip pile drivers give long life, issue free piling application.

 

VIBRA side grip pile driver saves time and money with elite execution and pile driving/extracting power. Side Grip Vibratory Hammer, can deal with, pitch and drive the sheet and tube piles. It is able to achieve the entire pile driving cycle without the requirement for manual treatment of the piles or helping machinery.

 

Design Details


Rotary Oscillation Mechanism

  • High torque slewing support
  • High pressure swing cylinder
  • Split control valve Compact central swivel
  • Front oil circuit interface

Gantry Hanger

  • One-piece structure
  • High pressure accumulator
  • Split control valve
  • Front oil circuit interface

Holding Clip System

  • High strength arm
  • Dual high pressure cylinders
  • Interchangeable collet
  • Simultaneous clamping and release of both arms

Vibrating Body

  • Imported drive motor
  • High strength box
  • high speed gear
  • Symmetrical eccentric arrangement
  • Increase the oil drain

Bottom Clip System

  • One-piece cast steel
  • Integrated cylinder
  • tooth plate
  • Pile hook mechanism

 

 

FAQ

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method ?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time ?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

 

A: Of course you can.

 

Q: How is your product quality ?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

 

Q: How to order?

 

A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.


Product Tags:

Side Grip Vibratory Hammer Pile Driver

      

20T Excavator Side Grip Pile Driver

      

Hydraulic Vibratory Hammer Pile Driver

      
Buy cheap Side Grip Hydraulic Vibratory Hammer Pile Driver For 20T Excavator product

Side Grip Hydraulic Vibratory Hammer Pile Driver For 20T Excavator Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shanghai Yekun Construction Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)